City of Lufkin, 300 E. Shepherd
Lufkin, Texas 75901, 936-634-8881

Engineering Services Department
Engineering Division

Engineering

Permit Review
Floodplain Management
Drainage Studies
Drainage Criteria Manual
Surveying
GIS Maps Overview
GIS On Line Mapping
Water and Sewer Taps
Tap Fees
Plat Review
Building Permit
Subdivision Plats
GPS Monumentation
Subdivision Ordinance
Technical Standards
Utility Extension Policy
Water Quality Report
Kurth Lake
 

Inspection Services

Report a Code Violation
Code Enforcement
FAQs
Building Permit
Building Permit Information
Permit Fee Schedule
Tap Fees
City Charter & Ordinances
Code Enforcement Map
 

Planning & Zoning

P & Z and BOAA Agendas
P & Z Meeting Schedule
Zone Changes
FAQs
Zoning Ordinance Information
Zoning Ordinance PDF
Zoning Application
Comprehensive Plan
Contact Us
Board of Adjustments and Appeals
P & Z Commission
Special Use Permit
Permitted Uses Info
Permitted Uses Chart
Downloads
Landscape Requirements PDF
   
 


TAP FEES

 

The following fees are payable to the City of Lufkin Inspection Services Department when a new or additional tap is needed.  All fees must be verified through the Engineering Department at City Hall before payment is made to the Inspection Services Department. 

Water Taps
                 Inside City Limits

Outside City Limits & Burke

SIZE Made by City w/Road Bore Laid in Place Made by City w/Road Bore Laid in Place
3/4" 318.00 495.00 278.00 477.00 742.50 278.00
1" 481.00 788.00 441.00 721.50 1182.00 441.00

2"

1850.00 1850.00 1810.00 2775.00 2775.00 1810.00
larger For any taps larger than 2" contact the Engineering Dept. for pricing.

 

Sewer Taps
  Inside City Limits

Outside City Limits

SIZE Made by City w/Road Bore Laid in Place

Not Available

4" 348.00 796.00 10.00
*6" 1606.00 1804.00  

*6" sewer must tie into manhole, if no existing manhole-cost will depend upon depth.

 

  PLEASE NOTE:

  • LAID IN PLACE TAPS = The property owner has located the City water/sewer lines and dug them up for the City to come by, make the tap and place a meter.

  • Sewer available inside Lufkin City Limits Only.

  • Water deposits are to be made at the Utility Collections Office prior to tap placement for hook-up of utilities.

  • To move meter, 1/2 of tap fee will be charged.

  • The City requires a lead time of ten (10) working days from the time of payment is made for the new tap to be placed.

  • If there is an existing water line serving the property and an additional tap is requested, the tap will be made as soon after the ten (10) working days, or before, if possible.  But those without water will be served first.

  • If there is NOT an existing City water line on or adjacent to the property, and a water line will have to be extended to serve the property, the distance of the extension will determine WHEN the tap can be made.

  • If the property owner has paid for a "laid in place" tap but cannot find the tap, then the City will locate the line for them for an additional fee.  After the balance is paid they will be back onto the schedule list in the order of taps received.